1 of 10

Direct Store

Weisshorn Sleeping Bag Single 213cm Thermal Camping Hiking Pink

In stock

Sale Sold out Pre-order
Regular price $39.00 AUD
Regular price $46.99 AUD Sale price $39.00 AUD
Shipping calculated at checkout.
  • All orders are dispatched within 24 hours after processing or next business day!

Description
Item Specifics

Experience year-round comfort with our premium 3-4 season sleeping bag, perfect for the Australian outdoors. With temperatures between -5 and 20 degrees, it ensures a cozy night's sleep from spring through to winter. Measuring a generous 213cm x 75cm, it offers plenty of room for adults to stretch out. The durable 190T polyester shell and soft-touch lining provide the perfect balance of warmth and breathability. Filled with 500gsm hollow fibre filling and lined with soft polyester pongee fabric, the sleeping bag is soft, lightweight and water-resistant. For added comfort, the two-way zipper at the bottom allows for easy foot ventilation, while the adjustable drawstring hood keeps you snug on chilly nights. Lightweight and highly portable, it packs down effortlessly into its compact carry bag—ideal for hiking and road trips. Planning a family adventure? We also stock the matching kids' version in our store so the whole family can stay cozy together! Durable, practical, and family-ready, it's the ultimate companion for your next camping getaway.

Features
500g/m² hollow fibre filling
Soft polyester pongee lining
Suitable for -5 degrees to 20 degrees
Lightweight
Water-resistant
Colourful design
Adjustable tightening strap
Secure closure velcro
Double opening zippers
Comes with a carry bag

Specifications:
Color: Pink
Material: 190T polyester ripstop
Filling: 500gsm hollow fibre
Lining: 190T polyester pongee
Temperature range: -5 degrees to -20 degrees
Comfort rating: 10 degrees
External dimensions: 213m (L) x75cm (W)
Packed dimensions: 27m (D) x45cm (H)
Weight: 2kg

Package Content
Single Sleeping Bag x 1
Carry bag x 1

This product comes with 1 year warranty

Shipping Restriction Notice

Shipments to the specific postcode-suburb combinations below are excluded. If you wish to proceed with orders to these zones with additional shipping costs, please reach out to your Account Manager for assistance.

SB-S-CURVE-PK
View Complete List of Undeliverable Postcode Suburb Combinations
Postcode Suburb / Location
0811 CASUARINA
0814 NIGHTCLIFF
0821 WINNELLIE
0822 LIVINGSTONE, GUNBALANYA, WAGAIT BEACH, PIRLANGIMPI, DOUGLAS-DALY, WEST ARNHEM, ACACIA HILLS, LAMBELLS LAGOON, WADEYE, ANGURUGU, GALIWINKU, MANINGRIDA, TUMBLING WATERS, MINJILANG, MILINGIMBI, RAMINGINING, FINNISS VALLEY, DALY RIVER, LLOYD CREEK, WARRUWI
0830 PALMERSTON CITY
0837 NOONAMAH
0845 BATCHELOR
0850 COSSACK
0851 KATHERINE
0852 TIMBER CREEK, MATARANKA, URALLA, LARRIMAH, LAJAMANU, BIRDUM, MINIYERI INTERNAL, MCARTHUR, BAINES
0854 BORROLOOLA
0861 TENNANT CREEK
0862 ELLIOTT
0871 ALICE SPRINGS
0872 YULARA, SANDOVER, TI TREE, MIMILI, ALICE SPRINGS, HERMANNSBURG, ENGAWALA, ALI CURUNG, SANTA TERESA, ANMATJERE, HAASTS BLUFF
0873 ILPARPA, AMOONGUNA, HEAVITREE GAP CPA
0880 YIRRKALA, GAPUWIYAK
0886 JABIRU
2628 AVONSIDE
2630 ROSE VALLEY
2795 CLEAR CREEK
2898 LORD HOWE ISLAND
2899 NORFOLK ISLAND
3709 MOUNT ALFRED
4275 ILLINBAH
4304 BOOVAL FAIR
4306 BLACKBUTT SOUTH
4310 WOOLOOMAN
4313 LOWER CRESSBROOK, TOOGOOLAWAH
4340 ASHWELL
4343 LOWER TENTHILL
4350 CLIFFORD GARDENS
4352 CONDAMINE PLAINS, YANDILLA, MOUNT LUKE
4357 MILLMERRAN DOWNS
4359 WEST HALDON
4361 MANAPOURI
4370 WOMINA, NORTH BRANCH, MOUNT COLLIERY
4380 SUGARLOAF, STORM KING
4403 WEST PRAIRIE
4404 FORMARTIN
4406 HANNAFORD
4407 NANGWEE
4413 GREENSWAMP
4415 KOWGURAN, DALWOGON
4416 BARRAMORNIE
4417 WELLESLEY, WERIBONE
4419 BUNGABAN
4423 TEELBA
4424 DRILLHAM
4428 WALLUMBILLA NORTH
4454 BEILBA, HIGHLAND PLAINS, ARCADIA VALLEY, MOUNT HOWE, MOUNT HUTTON
4455 TINGUN, BUNGEWORGORAI, BALLAROO, BLYTHDALE
4467 MUNGALLALA
4468 MORVEN
4470 SOMMARIVA
4474 ADAVALE
4477 AUGATHELLA
4478 MINNIE DOWNS
4479 COOLADDI
4481 WINDORAH
4486 HEBEL
4487 BEGONIA
4492 THARGOMINDAH
4493 HUNGERFORD
4496 TALWOOD
4566 NOOSAVILLE
4580 COOLOOLA
4605 BYEE
4606 GREENVIEW
4610 IRONPOT
4611 MARSHLANDS
4612 KEYSLAND
4613 KINLEYMORE
4625 DIRNBIR, BRANCH CREEK
4630 GLENLEIGH, MONAL
4650 WALKERS POINT, MOUNT URAH
4660 GOODWOOD
4671 BOOLBOONDA
4676 LOWMEAD
4699 BAJOOL
4702 JOSKELEIGH, BOOLBURRA, GINDIE, KALAPA, TARRAMBA
4703 LAKE MARY
4705 LOTUS CREEK
4714 HORSE CREEK, LEYDENS HILL
4719 ISLA, LONESOME CREEK
4721 THERESA CREEK
4726 ARAMAC
4732 MUTTABURRA
4741 COPPABELLA, PINNACLE, HAZLEDEAN
4751 PLEYSTOWE
4757 BROKEN RIVER
4798 PINDI PINDI
4800 CRYSTAL BROOK
4806 FREDERICKSFIELD, DALBEG, WANGARATTA, KIRKNIE, GROPER CREEK
4807 DALBEG, ALVA
4816 PALM ISLAND, SELLHEIM, MUTARNEE
4819 WEST POINT
4822 SAXBY, BELLFIELD, WOOLGAR
4823 JULIA CREEK
4824 THREE RIVERS
4825 KALKADOON
4829 BEDOURIE
4830 BURKETOWN
4849 DAMPER CREEK
4850 TOOBANNA
4854 MIDGENOO, FELUGA, MURRAY UPPER, EAST FELUGA
4855 JAFFA
4856 WALTER LEVER ESTATE, JAPOONVALE
4859 NO. 6 BRANCH
4860 MUNDOO, MIGHELL
4861 BARTLE FRERE
4865 PACKERS CAMP
4871 CROYDON, YARRABAH, GEORGETOWN, LAKELAND, MOUNT SURPRISE, FORSAYTH, ALOOMBA, MOUNT MOLLOY, WOOPEN CREEK, GERMANTOWN, BOOGAN, BRAMSTON BEACH
4872 INNOT HOT SPRINGS, BARRINE
4873 COW BAY, DAINTREE, LOWER DAINTREE, CAPE TRIBULATION, BAMBOO, WHYANBEEL, FOREST CREEK, CASSOWARY
4874 MAPOON
4875 HORN, MABUIAG ISLAND, BOIGU ISLAND, ERUB ISLAND, SAIBAI ISLAND, BADU ISLAND, MURRAY ISLAND, WARRABER ISLET, MER ISLAND, PORUMA ISLAND
4876 BAMAGA, SEISIA, INJINOO
4880 ARRIGA
4883 WONGABEL, CARRINGTON
4884 LAKE BARRINE
4885 NORTH JOHNSTONE, KUREEN, GLEN ALLYN, BUTCHERS CREEK
4886 MILLAA MILLAA, MINBUN, BEATRICE
4887 MOOMIN, WONDECLA, IRVINEBANK, WATSONVILLE
4888 EVELYN
4892 LOCKHART RIVER, AURUKUN, LAURA, GUNUNA
4895 DEGARRA, BLOOMFIELD
5223 CASSINI, NEWLAND, DUNCAN, CYGNET RIVER
5310 WANBI, CALIPH
5410 LINWOOD
5690 NULLARBOR
6220 UDUC
6221 WOKALUP
6225 CARDIFF
6231 BUNBURY
6236 WELLINGTON MILL, WELLINGTON FOREST, PARADISE
6239 YABBERUP, THOMSON BROOK
6258 RINGBARK
6260 CHANNYBEARUP, YEAGARUP
6262 BOORARA BROOK
6271 STIRLING ESTATE
6275 SCOTT RIVER EAST
6302 CALJIE, COLD HARBOUR
6304 DALE
6306 JELCOBINE
6311 TOWNSENDALE
6312 DUMBERNING
6315 WEDGECARRUP
6316 KENMARE, WESTWOOD
6317 PINWERNYING, MOOJEBING, COBLININE, MURDONG, EWLYAMARTUP
6328 GREEN RANGE
6330 LOWLANDS, KRONKUP, GOODE BEACH
6332 ALBANY PO
6333 TINGLEDALE
6338 BREMER BAY, BOXWOOD HILL, AMELUP
6348 HOPETOUN
6352 NORTH KUKERIN
6355 SOUTH NEWDEGATE
6356 LAKE KING
6359 HYDEN
6367 KONDININ
6383 CUBBINE
6397 ROCKY GULLY
6401 ROSSMORE, MURESK
6410 NORTH KELLERBERRIN, MOUNT CAROLINE
6412 NORTH BAANDEE
6423 WESTONIA
6424 SOUTH BODALLIN
6437 LEINSTER
6446 GRASS PATCH
6450 MYRUP, CONDINGUP, MERIVALE, BEAUMONT
6461 KOOMBERKINE
6472 BEACON
6475 BOORALAMING
6479 MUKINBUDIN, WILGOYNE
6485 KORRELOCKING
6503 BAMBUN
6506 MOGUMBER
6509 YARAWINDAH, GLENTROMIE
6515 WADDY FOREST
6519 WOMARDEN
6522 MINGENEW, BUNDANOON
6525 IRWIN, MOUNT ADAMS, YARDARINO
6531 GERALDTON PO
6532 BULLER
6535 ALMA, GREGORY
6562 COPLEY
6566 BEJOORDING
6568 WATTENING
6572 PIAWANING
6575 MILING
6603 MOCARDY
6605 KONDUT
6630 MULLEWA
6635 YALGOO
6638 MOUNT MAGNET
6642 MEEKATHARRA, PEAK HILL, KUMARINA
6646 LITTLE SANDY DESERT
6705 GASCOYNE JUNCTION
6707 NORTH WEST CAPE
6714 GAP RIDGE
6718 ROEBOURNE
6725 ROEBUCK, WATERBANK
6753 JIGALONG
6758 NULLAGINE
6760 MARBLE BAR
6770 TANAMI, MCBEATH, MUELLER RANGES
6798 CHRISTMAS ISLAND
7054 LOWER SNUG, FERN TREE
7109 CRADOC
7116 BROOKS BAY, CAIRNS BAY
7120 PARATTAH, LEVENDALE
7140 MALBINA
7170 ROCHES BEACH
7172 NUGENT
7175 MARION BAY
7211 CLEVELAND
7213 ROSSARDEN
7215 CHAIN OF LAGOONS
7255 MEMANA, LEEKA, LOCCOTA, RANGA, PALANA
7256 NARACOOPA, LOORANA, GRASSY, LYMWOOD, WICKHAM, YARRA CREEK
7304 CAVESIDE
7315 SPALFORD
7330 ROGER RIVER, ARTHUR RIVER, NABAGEENA, WOOLNORTH, BROADMEADOWS, SCOPUS

Description

Item Specifics

Shipping

We have worked hard to ensure your purchase get to you fast and in perfect condition. Please view our shipping policy and contact us if you have any questions.

View Shipping Policy